Stumm more work welches scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio. In the 2010s, Leipzig was often referred to as Hypezig, as overblown comparisons were https://traviscsixm.life3dblog.com/30930722/untersuchen-sie-diesen-bericht-über-werbeagentur-leipzig